Home / Sectors / Petrochemical & Process Industries
Sector

Petrochemical & Process Industries

Knock-out drums, gas filters, reactors, MEG tanks, blending vessels and flare systems — ASME stamped equipment fabricated in Fujairah for QAFCO, Qatar Petroleum, RasGas, TAKREER, ENOC lubricants and chemical plants, plus complete blending and manufacturing plants.

What we deliver

  • ASME VIII Div 1 and 2 vessels, drums and columns
  • Lubricant blending and manufacturing plants
  • Flare risers, KO drums and sulphur guard vessels
  • Stainless and alloy steel process tanks
  • Air-cooled condenser structures and steam ductwork
Projects

Petrochemical & Process Industries — projects

MEG Tanks (6 nos.) — RasGas, QatarFabrication · Export

MEG Tanks (6 nos.) — RasGas, Qatar

Six mono-ethylene glycol storage tanks fabricated for McDermott's RasGas project.

Qatargas / RasGas2017
EPC

ELOMP — Phase II Expansion & Blending Facilities

EPC of the Phase II expansion — cooling package and coolant, brake fluid and turbine oil blending and filling facilities.

ENOC Lubricants & Grease Manufacturing (ELOMP)
Gas Filter Vessels — Qatar PetroleumASME VIII Div 1 · 84.5 t

Gas Filter Vessels — Qatar Petroleum

Two gas filter vessels with 35 mm shells and 65 mm ellipsoidal heads in SA 516 Gr.70N, 47.7 bar design.

Qatar Petroleum2016
KOD Vessel — TAKREERASME VIII Div 1

KOD Vessel — TAKREER

Ø 3,500 mm × 12,000 mm knock-out drum in SA 516 Gr.60N for TAKREER, via Tata Projects.

TAKREER (ADNOC Refining)2016
Knock-Out Drums (2 nos.) — Qatar PetroleumASME VIII Div 2 · 62 mm

Knock-Out Drums (2 nos.) — Qatar Petroleum

Two ASME VIII Division 2 knock-out drums, Ø 3,800 mm × 9,000 mm, 62 mm shell, SA 516 Gr.70N, −84 °C design.

Qatar Petroleum2016
ELOMP Lube Oil & Grease Manufacturing Plant — Phases I to IVENOC · Blending plant

ELOMP Lube Oil & Grease Manufacturing Plant — Phases I to IV

Base oil tanks, additive vessels, blending vessels, piping, pipe racks, truck loading bay and utilities for ENOC's lubricants plant.

ENOC Lubricants & Grease Manufacturing (ELOMP)
Maintenance · EPC · Fabrication

Total Lubricants — Jebel Ali Plant

Three contracts at one plant — 61-tank painting and maintenance, a piggable jetty pipeline EPC, and blending vessel fabrication.

Total Lubricants
Additive Storage Vessels — ELOMPASME VIII Div 1

Additive Storage Vessels — ELOMP

Additive storage vessels V-215 to V-223 — Ø 4,000 mm × 11,500 mm, 19 t each, A516 Gr.70N.

ENOC / ELOMP2014
Ammonia Flare KO Drum — QAFCOASME VIII Div 1 · 36.5 t

Ammonia Flare KO Drum — QAFCO

Ø 3,400 mm × 10,615 mm knock-out drum, 25 mm wall, A516 Gr.70N, −46 / 450 °C design.

QAFCO2013