The project
For the MERAM project under ADNOC Gas, with main contractors NMDC Energy and Técnicas Reunidas, Cylingas is delivering an LNG storage sphere that pushes UAE fabrication to a new limit — shell plates past 125 mm, 3D-formed with an international partner.
The scope
EPC of the Ø 18.5 m sphere in SA 516 Gr. 70N carbon steel, designed for LNG in sour gas service and fully compliant with NACE and HIC requirements.
Projects
More in LNG, LPG & Cryogenic
Cryogenic · 9% NiBorouge 4 Ethylene Storage Tank
Ø 41 m × 25 m cryogenic ethylene tank — 9% nickel inner tank in a concrete outer wall. Cylingas's first full cryogenic storage EPC.
Main EPC · ASME Div 2DUGAS Pressurised Propane Spheres
Two Ø 21 m propane spheres, 63 mm shell, 950 t each, 21.5 bar(g) — design through commissioning as main EPC contractor.
LPG · Design & supply
Emirates Gas — 18 LPG Tanks & Tanker Refurbishment
Design and supply of 18 LPG tanks plus tanker repair and refurbishment under various contracts.