ZIA Aviation Fuel Terminal
EPC of aviation fuel storage at Zayed International Airport — tank farm, mechanical, piping, E&I, civil and structural works with integrated safety systems, delivered by the Cylingas & Trojan joint venture as main contractor.
The project
Zayed International Airport's fuel farm keeps Abu Dhabi's aviation hub flying. Under an ADNOC contract awarded in 2024, the Cylingas & Trojan joint venture is delivering the complete EPC — design, procurement, construction, testing, commissioning and start-up.
The scope
Sixteen storage tanks with the full balance of plant: tank farm civil and structural works, mechanical and piping, electrical and instrumentation, and integrated fire and safety systems. Site workforce peaks above 1,000 people.
More in Aviation Fuel
Dubai Aviation Engineering Projects — Tank Refurbishment
Complete refurbishment of five API 650 tanks with piping and E&I refurbishment under a maintenance contract.
DWC Airport — Into-Plane Facility
EPC of a jet fuel truck loading bay with control room and into-plane loading facility.
Al Maktoum International Airport — Jet Fuel Farm Upgrade
Five jet fuel tanks of Ø 31 m × 17.5 m with upgrading, retrofitting and refurbishment of the fuel facilities.