The scope
Truck loading bay with control room and jet fuel loading facility, delivered turnkey.
Projects
More in Aviation Fuel
ADNOC · Main EPCZIA Aviation Fuel Terminal
EPC of the aviation fuel storage terminal at Zayed International Airport — 16 tanks with full balance of plant.
Maintenance · API 653
Dubai Aviation Engineering Projects — Tank Refurbishment
Complete refurbishment of five API 650 tanks with piping and E&I refurbishment under a maintenance contract.
Aviation · 5 tanks
Al Maktoum International Airport — Jet Fuel Farm Upgrade
Five jet fuel tanks of Ø 31 m × 17.5 m with upgrading, retrofitting and refurbishment of the fuel facilities.