The scope
Two API 650 storage tanks with associated piping, delivered 2020–2022.
Projects
More in Power & Water
2,000 t structureDubai Energy-from-Waste — Air Cooled Condensers
Nearly 2,000 tonnes of ACC structural steel and 700 tonnes of LP steam ductwork to Ø 6.5 m — fabricated, pre-assembled and lifted into position.
Power · 7 tanksDEWA Power Station — Diesel & Demin Water Tanks (Ph II–III)
Six Ø 35 m diesel storage tanks and a Ø 21 m demineralised water tank — engineering to commissioning.