
Various contracts
DUGAS Plant — Methanol Lines, Fire Safety & Equipment Supply
A series of contracts at the DUGAS gas plant — two new methanol lines and fire safety upgrades, plus supply of a secondary reactor, a propane refrigerant compressor suction drum and an oil trap for the chilled water exchanger.
Plant upgrades
Two new methanol lines and fire safety upgrades across the facility.
Equipment supply
Secondary reactor, propane refrigerant compressor suction drum and oil trap for the chilled water exchanger, fabricated in the Cylingas shop.
Projects
More in Oil & Gas
ADNOC · Robt Stone
Al Dabbiya Thamama C — Water Storage Tank
Storage tank works at ADNOC's Al Dabbiya field for Robt Stone — awarded 2020, water storage tank completed 2023.
Main EPC
ECOMAR Petroleum Processing Facility — Phase II
Main EPC contract for the Phase II expansion of ECOMAR's petroleum processing facility in Fujairah.
ADNOC Onshore
MP-21 Upgrade — 2 Storage Tanks
Two storage tanks for the MP-21 upgrade, delivered as subcontractor to Robt Stone.